January 8, 2018
159
1
0.63%
Every word spoken in this episode is indexed. Type any phrase to jump straight to the moment it was said.
Type any word or phrase that may have been spoken. Click a result to seek the player to that exact moment.
Try a name, a topic, or a quoted line
2:41Now PlayingNatalia Hepworth
Jan. 8, 2018
SCRIPT
SWAN VALLEY -- VO: In December of 2016 a blazing fire destroyed the Palisades ward church building belonging to the Church of Jesus Christ of Latter-day Saints. Since the tragedy, steady progress has been made on a new building.
SOT: 8:50 - “We broke ground in the summer of 2017. It’s been fun to watch people pull over and take pictures of the progress and to be excited about it,” Public Affairs Director for the Ririe Idaho LDS Stake Sharon Parry says.
VO: The Bishop of the Palisades Ward Terry Hulse says members have been conducting Sunday meetings in a local elementary school for a year.
SOT: “There are members who have spent their whole lives here, and this building is seventy years old. There are members who only know this building so it was a tragedy for them to lose it,” Hulse says.
VO: Although it was a loss many community members and leaders of other faiths reached out in support. The cause of the fire is unknown and thankfully no one was injured.
SOT: 13:14 - “Nobody has complained. They were all shocked at first with the loss of the building but then everybody just pitches in to make things work on Sundays,” Hulse says. “We have to set things up and take things down for school starting on Monday so we’re in and out and everybody’s cooperated really well.”
VO: Hulse says after the fire it seems like progress on the new building was slow, but a lot was happening behind the scenes.
SOT: 15:29 “The second day after it burned we had the building department from the church from Utah, they came and assessed what we had and what we needed, and they immediately started on the plans and permits and all those things that have to happen before the construction could actually take place,” Hulse says.
VO: The new building will be nearly as big as the last measuring over 15,000 square feet. It will have the same elements of a church building including a chapel, gym, classrooms, and offices.
STAND UP – CLIP 14 - (walk through with Dallas explaining where the chapel and pulpit area is.)
SOT: 19:39 - “It will be a brick building, there will be some efis like stucco on some of it. It’s a little different than some other jobs; we have metal shingles instead of asphalt shingles,” Superintendent with Headwaters Construction Company Dallas Brown says.
STANDUP – I’m in the transition area of the gym and the chapel. By the time it’s complete this area should be able to hold 550 churchgoers.
SOT: 9:24 - “It will be tailor- made to the Palisades ward. We’re not a very large congregation during your average weekend, but during vacation land times we feel the need to open the doors to a lot of vacationers, passersby and families that come to their family cabins to vacation. That means there’s a need for more seating,” Parry says.
VO: Parry says the Palisades Ward is grateful for all the help they’ve received during the last year. Doors will reopen upon the building’s completion toward the end of this year. In Swan Valley, I’m Natalia Hepworth EastIdahoNews.com.
Sentinel Indexing in Progress
Metadata and chapters are available. Claim extraction for this episode is pending.
All video content is delivered via YouTube embedded players in accordance with the YouTube Terms of Service. Sentinel provides research tools that promote discovery and accountability across political media.